Posts

Ta-Da!

Image
Not only because we finally have a picture of the socks, but also because I have figured out how to share a picture of the socks from my laptop.  This is very big news, because it means that A) the puppy has not chewed up a second cable, and B) I have figured out the Linux/Ubuntu methods of sharing pictures, which are different than the Windows/Microsoft software programs on my desktop computer.  In all other things, I really have learned to prefer Linux (especially on that money issue), but getting photos onto the blog has been a bit.....problematic.  I have been able to add them sideways or upside down, but tonight's right-side-up achievement is, perhaps, a first.  So....I will also show you the September Project of the Month which is the brown pajama top for Andy's coffee pjs, which wouldn't be quite as necessary now that I've found the missing pajama top.....except for the fact that now I can't find the extra material that I was going to piece together to ma...

So, You Might Be Wondering.......

What happened to the blog updates?  Well, I am dog & house sitting for friends, and in order to get ready for that, I spent Friday running errands and Saturday making salsa.  Then I wasn't here for 24 hours before one of the dogs chewed up my laptop cord, so as soon as my battery ran out, my laptop was done.  Andy ended up loaning me his cord until we can order a new one from Dell, so here I am.  Or at least as long as Andy's old laptop holds out. However, there has finally been some knitting, and the Sunshine Socks are done!!!!!!  They would be project 61, so 39 left to go and 117 days left to get there.  Theoretically, the part for Jeeves should have been shipped 13 days ago, and IF they couldn't find an even slower method of shipment than predicted, and IF the repair guy works this week and IF they bother to call me when Jeeves is actually ready and IF they actually fix the existing problems without creating any new ones, I could be embroidering i...

September 1: 4 Months and 40 Projects To Go

It's the first of September, and my totals for the year stand thus (don't you just love it when you can use an obscure old word like "thus?"): Finished projects:  60 Total skeins of yarn used:  39.1 Total yards of yarn used:  8673.5 Total yards of fabric used:  63.69 With 4 months to go, I need 40 projects, and I'm really hoping to hit 100 yards of fabric used for the year.  I would have sworn I have used up more than 39 skeins of yarn, but as there has been a lot of lace happening, that probably makes sense.  BUT..... could I at least reach 50 by the end of the year???????? And what am I doing working on a quilt????????????

Let's Just Call It "Progress" Friday

Image
A LOT of progress.  With a sidekick who is still not quite sure if he likes Bernie, I finished the last block for the Christmas quilt, sewed all the blocks together, added a small border, then swept the floor downstairs so I could do this I'm sure other people have different ways of doing this, but taping the backing onto the floor and then pinning everything onto it is the only way I don't get massive puckers in the back of the quilt.  In the future, if I were to use this quilt design again, I would make even numbers of blocks for each row--that way all the edges would end with the same color.  But, I think this is going to be a nice size, and I am STILL hoping to finish it for a Christmas gift (I know--I could have brighter ideas during the 100-projects year), so I'm going to live with it as it is.  The backing is massive because I first had tried putting together a back piece that was only slightly bigger than the quilt top....and discovered after washing it,...

Knitting on a Knitting Blog?

Image
Really, what is the world coming to? I have taken a bit of a break on the sewing marathon to give the sock a bit of attention, and I have turned the heel!  It's a really interesting heel It's a basket weave pattern, using the slip 1, knit 1 pattern I usually use on heel flaps, but making a 4-row pattern of it, moving the slip 1 over by one stitch on the 3rd row, then back again on row 1.  I'm really pleased with it--it gives the thickness of the slip 1, knit 1 pattern, but looks more interesting.  I've done the gusset decreases & am now just at the foot knitting, so I'm hoping that moves pretty quickly.  I have a whole second sock to do, after all...... Not that I've taken a break from sewing entirely.  I decided to take a break from garment sewing, so I played around with my first attempt at applique.  I was pleased to find that there is actually something good about all those darn reply cards packed into every magazine, they make decent pat...

Picture Time!

Image
Last night we were meeting a friend for dinner at 7:30, so I was sewing like a madwoman to finish this which is the FIFTH paisley piece from this pattern.  I've made the dress (above), pants (complete with Joanns logo,  so they are now known as "house pants" and will eventually be joined by another pair of pants that won't be advertising anybody on my hips), jacket, tunic, and sleeveless top--which looks exactly like the tunic but shorter and without the sash.  Later I'll add a black jacket of some sort and maybe some sort of black tunic, and will have a pretty complete ensemble , provided I don't get sick of paisley.  The vintage pattern is done as well, though I seem to have messed up the closures and need to figure out a way to close the piece that wraps around the back without the loop that I thought was to go on the front.  I'm thinking snaps, but I was so annoyed when I discovered my mistake that the dress is currently in the Project Protecti...

6 Projects So Far!!!!!!!!!!!!!

Bernie and I are taking a break from our mad sewing marathon to give you an update: We have finished SIX projects together so far! Eat?  Sleep?  What???????????? Just a little over 4 months left in the year and 40 projects left to go!!!!!!!!! (And the weather is lovely here in Crazyland........just in case you were wondering.......)